Factors and their effect

Factor
Wall construction
Tends to increase scope when
Plaster is detached or charred and must be rebuilt
Tends to reduce scope when
Plaster is sound and can be cleaned and sealed
Factor
Framing type
Tends to increase scope when
Open cavities carried smoke between floors
Tends to reduce scope when
Platform framing contained smoke to one area
Factor
Hazardous materials
Tends to increase scope when
Asbestos or lead must be abated before work
Tends to reduce scope when
Testing is negative or materials will not be disturbed
Factor
Wiring
Tends to increase scope when
Old wiring must be replaced in opened walls
Tends to reduce scope when
Wiring was updated before the fire
Factor
Original finishes
Tends to increase scope when
Custom milling or specialty refinishing is needed
Tends to reduce scope when
Damage is limited to painted or replaceable surfaces
Factor
Matching
Tends to increase scope when
Continuous floors, roofs or tile must be redone for a match
Tends to reduce scope when
Patches blend or materials are readily available
Factor
Access
Tends to increase scope when
Steep roofs, tight lots or alley access complicate work
Tends to reduce scope when
Easy access for equipment and dumpsters
Factor
Season
Tends to increase scope when
Winter requires temporary heat or freeze protection
Tends to reduce scope when
Mild weather allows faster drying

Reading an estimate with these factors in mind

Two estimates for the same fire can differ greatly because they assume different answers to the questions in that table. One might assume all plaster comes out and drywall goes in; another might plan to save most walls. One might include milled trim, the other stock trim. Neither is necessarily wrong, but you should know which assumptions each estimate makes.

Look for line items that describe your actual materials. If the house has plaster and the estimate lists only drywall, ask why. If it has fir trim and the estimate lists finger-jointed pine, ask whether that is intended as the match. Older homes often get underestimated simply because the software defaults to modern materials.

Check each estimate for

Questions when estimates disagree

  1. Which walls does each estimate assume will be removed, and why?
  2. Does either estimate assume hazardous materials, and has testing been done?
  3. How does each estimate handle matching original trim and floors?
  4. What assumptions about hidden damage are built in?
  5. What would change the scope once walls are opened?

Common questions

Is the lowest estimate the one the insurer will pay?

Not necessarily. Insurers usually write their own estimate and compare it with contractors' figures. A detailed contractor estimate that explains why older materials need specific work gives you more to discuss than a lower, generic one.

General information for Park Hill, not a quote or professional advice. In an emergency, call 911.